The article is discussing the possible options for the implementation of potential energy, which is contained in the gas pipeline in the form of pressure, which is actually lost when the gas is reduced at the GDS. Improving energy efficiency is a major challenge for Bulgaria’s economic development. The extensive development of Bulgaria’s gas pipeline network and the increase in the level of gasification also increases the energy that is actually released into the atmosphere. Are considered various options for the implementation of overpressure for the purpose of increasing energy efficiency, the realization of which will not only improve the efficiency of the construction of the distribution network of gas pipelines, but also will partially solve the problem of the widespread introduction of road transport on electricity and liquefied gas.