BUSINESS

THE PROBLEM OF OVERLAPPING PROJECT ACTIVITIES WITH INTERDEPENDENCY

  • 1 Department of Industrial Engineering and Management, SCE-Shamoon College of Engineering, Beer Sheva, Israel

Abstract

This paper analyzes a simple project with two activities. The activities can be executed in a serial mode (separately), in a parallel mode (overlapping), or in a mixed mode (partly in a serial mode and partly in a parallel mode). There is interdependence between the activities and the duration-budget tradeoffs functions of the activities are defined differently for each execution strategy. The paper presents a deterministic duration-budget tradeoff model that takes into account the interdependence between the activities in order to determine the optimal execution-mode and the budget distributions among the project activities. A stochastic extension of the proposed model is also considered. The presented analysis can help project managers and practitioners in choosing the optimal overlapping strategy for different objective functions and constraints.

Keywords

Article full text

Download PDF