MACHINES
RESEARCH WORK ABOUT THE TROUBLE-FREE OPERATION OF A ROBOTIC CELL FOR THE WELDING OF THE BOGIE FRAME ON A FREIGHT WAGON
This research work presents the results of the monitoring on a robotic cell operation for welding the bogie frame on a freight wagon for two months. The structure of the robotic welding cell is revealed and a register of the occurred failures was formed. A statistical processing of the received information has been made and an analytical expression about the trouble-free operation has been determined. Recommendations for increasing trouble-free operation are suggested.